{"id":2614,"date":"2020-06-16T20:30:49","date_gmt":"2020-06-16T18:30:49","guid":{"rendered":"https:\/\/www.instop.biz\/blog\/?p=2614"},"modified":"2024-09-02T07:46:40","modified_gmt":"2024-09-02T06:46:40","slug":"embankment-monitoring-hamm-railway","status":"publish","type":"post","link":"https:\/\/www.instop.biz\/blog\/embankment-monitoring-hamm-railway\/","title":{"rendered":"Embankment Monitoring: Hamm Railway"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/www.instop.es\/auscultacion\/i\/Hamm-case-study-main-banner.JPG.png\" \/><\/p>\n<h2>Challenge<\/h2>\n<p>The Dortmund to M\u00fcnster railway line is one of Germany\u2019s major train lines. During the end of 2018 a major fissure appeared along a 100m stretch of embankment, which ran parallel to the rail line. There was much concern and it was deemed necessary to deploy an emergency monitoring system to investigate further, eliminate potential risk and prevent any interference with the busy train line.<br \/>\nDue to Senceive\u2019s pedigree in providing monitoring solutions for both slopes and track bed within the rail industry throughout Europe and beyond, Deutsche Bahn selected Senceive\u2019s FlatMesh\u00ae system to monitor at-risk areas once the fissure had been filled in. This smart wireless system can be easily deployed in a matter of hours and allows the rail maintainer to see the relationship between slope and track.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.instop.es\/auscultacion\/i\/hamm-img-1.png\" \/><\/p>\n<h2>Solution<\/h2>\n<p>To better understand and manage the impact of any potential slope movement to the track, Senceive sent an emergency track monitoring kit, consisting of 34 triaxial tilt sensors and a FlatMesh\u00ae gateway to measure sub-mm movements, which can be deployed in a matter of minutes if required. For the main investigation 3km embankment were monitored using a total of 233 stake-mounted triaxial tilt nodes, arranged in two offset rows at approx. 25m intervals. A FlatMesh\u00ae camera was also deployed to give clear still shots 24\/7 of the main area that had the filled in fissure. This would be triggered upon significant movement.<br \/>\nThe wireless sensors were all able to communicate with 7 solar powered gateways, which then transmitted secure data to the WebMonitor visualisation software, which can then be accessed online by registered users.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.instop.es\/auscultacion\/i\/hamm-img-2.png\" \/><\/p>\n<h2>Outcome<\/h2>\n<p>During the late winter period, up to 9mm of movement was detected by multiple sensor nodes in the at-risk area during a one-week period, before returning back to the baseline. The FlatMesh\u00ae camera images could easily be accessed remotely and clearly showed that the area experienced snow during this time, which indicates that the movement was caused by extreme variations in temperature causing the ground to contract\/expand.<br \/>\nThis precise data and accompanying visuals corroborate the hypothesis that the fissure, and original movement that caused it, was due to de-vegetation of a local field which impacted the soil moisture levels near the rail line. This was then further influenced and exacerbated by seasonal changes such as the snow in winter. The exceptional battery life of the nodes, of 12-15 years, offers the flexibility for the monitoring duration to be extended to further investigate the seasonal impact on the slope movement and the emergency track bed monitoring kit is on hand in the event of movement relating to slippage which might impact the rail line.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Challenge The Dortmund to M\u00fcnster railway line is one of Germany\u2019s major train lines. During the end of 2018 a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-container-style":"default","site-container-layout":"default","site-sidebar-layout":"default","disable-article-header":"default","disable-site-header":"default","disable-site-footer":"default","disable-content-area-spacing":"default","footnotes":""},"categories":[9199],"tags":[],"class_list":["post-2614","post","type-post","status-publish","format-standard","hentry","category-senceive-casos-de-estudio"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/posts\/2614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/comments?post=2614"}],"version-history":[{"count":2,"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/posts\/2614\/revisions"}],"predecessor-version":[{"id":3946,"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/posts\/2614\/revisions\/3946"}],"wp:attachment":[{"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/media?parent=2614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/categories?post=2614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.instop.biz\/blog\/wp-json\/wp\/v2\/tags?post=2614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}